Building Estimation And Quantity Surveying

Learn Full Practical Civil Engineering Building Estimation Course With AutoCad And Ms-Excel/Quantity Take-off Techniques

Last updated 2022-01-10 | 4

- How to Read Architectural and Structural Drawings
- Building Estimation of Complete Project Through Auto Cad and Ms- Excel
- How to find quantity of excavation of soil
- brickwork of sub- structure and super structure

What you'll learn

How to Read Architectural and Structural Drawings
Building Estimation of Complete Project Through Auto Cad and Ms- Excel
How to find quantity of excavation of soil
brickwork of sub- structure and super structure
Calculation of Quantity of Concrete of All R.C.C Members of Building
How to Calculate Shuttering Area of All R.C.C. Members and their Bill Preparations
Calculation of Cement Sand Aggregate In Concrete
How to Calculate the Quantity of Plaster Work (Internal And External)
Marble Work and Tile Work
All Estimates are Prepared In Ms-Excel

* Requirements

* Laptop
* PC
* Auto Cad
* Ms-Excel
* Basic Knowledge of Civil Engineering

Description

In this course, you will learn how to make a detailed estimate of the building from the structural drawing. And the detailed estimate is prepared in MS-Excel by directly taking off the quantities from AutoCAD drawing. At every site, we have to make a detailed estimate of building,

1. To order the quantities of concrete from the RMC plant.

2. To prepare the bill for the client(Govt. or Pvt)

3. To prepare the bill of subcontractors.

4. To order the quantities of material such as bricks, cement, sand, aggregates, marble, tiles, steel, etc.

The detail estimates include

Foundation work/ Sub-Structure Constructions

1. Quantities of excavation of footing and foundation walls.

2. Quantity of plain cement concrete below footings and foundation walls.

3. Quantity of concrete of isolated/ tapered footings.

4. Quantity of concrete in columns below the plinth level.

5. Quantity of concrete in the plinth beams of the building.

Super-Structure Construction

1. Quantity of concrete in the lintel beam.

2. Quantity of concrete in roof beams

3. Quantity of concrete in the roof slab

4. Quantity of concrete in the staircase

Brickwork in building

1. Quantity of Brickwork in the foundation (substructure) below the plinth level.

2. Quantity of Brickwork above the plinth level( Super-structure).

Shuttering Area Calculations

1. Calculation of the shuttering area of all the R.C.C. members of the building like footings, columns, beams, slab, etc

Finishing Work

1. Marble work

2. Tile work

3. Internal plaster

4. External plaster

Calculation of cement sand aggregates in concrete

THIS COURSE IS BENEFICIAL FOR ALL THE STUDENTS, FRESHERS AND WORKING PROFESSIONAL CIVIL ENGINEERS, WHO ARE FACING PROBLEMS IN SITE FOR BILLING WORK OR IN PREPARING DETAILED ESTIMATE OF BUILDING.

Students can enhance their knowledge from very basic to advance levels from this course.

Who this course is for:

  • All Students, Freshers and Working Professional Civil Engineers
  • Who Wants to Start their Construction Business

Course content

9 sections • 29 lectures

Introduction Preview 01:32

In this course, you will learn how to make a detailed estimate of the building from the structural drawing. And the detailed estimate is prepared in MS-Excel by directly taking off the quantities from the AutoCAD drawing. At every site, we have to make a detailed estimate of the building,

1. To order the quantities of concrete from the RMC plant.

2. To prepare the bill for the client(Govt. or Pvt)

3. To prepare the bill of subcontractors.

4. To order the quantities of material such as bricks, cement, sand, aggregates, marble, tiles, steel, etc.

The detailed estimates include

Foundation work/ Sub-Structure Constructions

1. Quantities of excavation of footing and foundation walls.

2. Quantity of plain cement concrete below footings and foundation walls.

3. Quantity of concrete of isolated/ tapered footings.

4. Quantity of concrete in columns below the plinth level.

5. Quantity of concrete in the plinth beams of the building.

Super-Structure Construction

1. Quantity of concrete in the lintel beam.

2. Quantity of concrete in roof beams

3. Quantity of concrete in the roof slab

4. Quantity of concrete in the staircase

Brickwork in building

1. Quantity of Brickwork in the foundation (substructure) below the plinth level.

2. Quantity of Brickwork above the plinth level( Super-structure).

Shuttering Area Calculations

1. Calculation of the shuttering area of all the R.C.C. members of the building like footings, columns, beams, slab, etc

Finishing Work

1. Marble work

2. Tile work

3. Internal plaster

4. External plaster

Calculation of cement sand aggregates in concrete

THIS COURSE IS BENEFICIAL FOR ALL THE STUDENTS, FRESHERS AND WORKING PROFESSIONAL CIVIL ENGINEERS. WHO ARE FACING PROBLEMS IN SITE FOR BILLING WORK OR IN PREPARING DETAILED ESTIMATE OF BUILDING.

Students can enhance their knowledge from very basic to advance levels from this course.

HOW TO FIND QUANTITY OF EXCAVATION OF FOOTINGS Preview 06:39

In this lecture, you are going to learn how to calculate the quantity of excavation of footings from drawing. on-site you have to prepare the Bill of the quantity of excavation of footings for the client as well as for subcontractor. The excavation quantity sheet is prepared in MS- Excel by taking off the quantities from AutoCAD drawing.

QUANTITY OF EXCAVATIONS OF BRICK WALL FOUNDATIONS Preview 05:48

In this lecture, you are going to learn about the quantity of excavation of foundation walls. while doing billing work of excavation we have to take both the quantities i.e. excavations of footing and excavation of foundation walls which is made of bricks. because our substructure contains both footings and foundation walls. All the Quantities are prepared in MS-Excel with the help of Autocad.

HOW TO CALCULATE QUANTITY OF P.C.C. OF FOOTINGS Preview 03:28

In this lecture, you are going to learn how to calculate the quantity of Plain Cement Concrete below the footings. the concrete of footing should not make direct contact with soil that is why a layer of P.C.C. is done between the footing and the ground. the quantities are calculated in MS-Excel directly with the help of Autocad.

CALCULATE QUANTITY OF P.C.C. BELOW BRICK WALL OF FOUNDATIONS Preview 03:49

In this Lecture, you are going to learn how to calculate the quantity of P.C.C. below the brick wall foundation. The plain cement concrete (P.C.C.) is also done below the foundation walls so that a hard and flat base is made below the brickwork foundation wall. the quantities are calculated in MS-Excel directly through Autocad

HOW TO CALCULATE QUANTITY OF CONCRETE IN ISOLATED FOOTING Preview 03:40

In this Lecture, you are going to learn how to calculate the quantity of concrete on the isolated footing. The isolated footings are also known as tapered footings. The quantity of concrete in isolated footing is solved in two parts first is the base part and the second is the tapered portion. The quantity of concrete of all the footings in the drawing is calculated in the MS Excel sheet by taking off the quantities directly through AutoCAD.

CALCULATE QUANTITY OF CONCRETE IN COLUMN BELOW PLINTH LEVEL Preview 03:21

In this lecture, you will learn how to calculate the quantity of concrete in columns below the plinth beam. The casting of concrete is done in parts that are the first part is below the plinth level and the bill is prepared which comes under the sub-structure part and then we will cast the concrete above the plinth level. the total quantity of concrete is calculated in MS-Excel using AutoCAD.

QUANTITY OF CONCRETE IN PLINTH BEAM Preview 03:11

In this lecture, you will learn how to calculate the quantity of concrete in the plinth beam according to the drawing. The plinth beam is the beam that lies on the ground level. All the quantities of concrete are calculated directly in MS-excel using AutoCAD.

CALCULATION OF QUANTITY OF CONCRETE IN COLUMN ABOVE PLINTH LEVEL Preview 01:59

In this lecture, you will learn how to calculate the quantity of concrete in columns above the plinth beam. The casting of concrete is done in parts are the first part is below the plinth level and the bill is prepared which comes under the sub-structure part and then we will cast the concrete above the plinth level which comes under the superstructure part. the total quantity of concrete is calculated in MS-Excel using AutoCAD.

CALCULATE QUANTITY OF CONCRETE IN LINTEL BEAM Preview 03:56

In this lecture, you will learn how to calculate the quantity of concrete in the lintel beam. The lintel beams are the beam that is provided above the door and window frames so that the wooden frames should not bear any type of load.

CALCULATE QUANTITY OF CONCRETE IN ROOF BEAMS Preview 03:29

In this lecture, you will learn how to calculate the quantity of concrete in the roof beam. The roof beam is the beam that is cast below the slab and the reinforcement bars of the beam are interconnected with the slab reinforcement. The quantity of concrete of all the roof beams is calculated directly in MS-Excel using AutoCAD.

CALCULATE QUANTITY OF CONCRETE IN ROOF SLAB Preview 01:45

In this lecture, you will learn how to calculate the quantity of concrete in the roof slab. The casting of the roof beam and roof slab is done together on the same day as the casting of concrete. The quantity of concrete whole slab is calculated directly in MS-Excel using AutoCAD.

INTRODUCTION TO BRICKWORK Preview 02:09

In this lecture, you will learn to calculate the number of bricks in 1 cubic meter of brickwork. We have to find the number of bricks according to the Indian standard size of a brick.

the size of brick is different on site so we have to find out the number of bricks according to the size of brick used on site.

HOW TO CALCULATE NUMBER OF BRICKS IN FOUNDATION (SUB STRUCTURE) OF BUILDING Preview 04:22

In this lecture, you will learn how to find out the number of bricks in the foundation wall of the building. The foundation wall is constructed from column to column below the plinth level. So we have to find out the number of bricks used according to the drawing. And these quantities are calculated directly in MS-Excel. By taking off quantities from AutoCAD.

CALCULATE THE QUANTITY OF BRICKS ABOVE PLINTH LEVEL (SUPER STRUCTURE) Preview 03:57

In this lecture, you will learn how to find out the number of bricks above the plinth level(super-structure). The brick wall is constructed from column to column above the plinth level. So we have to find out the number of bricks used according to the drawing. And these quantities are calculated directly in MS-Excel. By taking off quantities from AutoCAD.

CALCULATION OF QUANTITY OF CONCRETE IN STAIRCASE Preview 06:04

In this lecture, you will learn how to calculate the quantity of concrete in the staircase. This is the type of dog-legged staircase, which consists of two landings one waist slabs and the steps of stairs.

SHUTTERING AREA OF AN ISOLATED FOOTING Preview 02:42

In this lecture, you will learn how to calculate the shuttering area of isolated footings. The shuttering area is calculated so as to make the bill of sub-contractor and also for client bills. The bill is explained in MS-Excel and it is prepared according to AutoCAD drawing.

SHUTTERING AREA OF COLUMN BELOW PLINTH BEAM Preview 03:24

In this lecture, you will learn how to calculate the shuttering area of columns. The height of the column is taken below the plinth beam. Because the shuttering work is calculated in two parts- below plinth beam and above plinth beam. The shuttering area is calculated so as to make the bill of the sub-contractor and also for the client bill. The bill is explained in MS-Excel and it is prepared according to AutoCAD drawing.

SHUTTERING AREA OF PLINTH BEAM Preview 03:08

In this lecture, you will learn how to calculate the shuttering area of the plinth beam. The shuttering plates are used on two faces of beam inner and outer face. The shuttering area is calculated so as to make the bill of the sub-contractor and also for the client bill. The bill is explained in MS-Excel and it is prepared according to AutoCAD drawing.

SHUTTERING AREA OF COLUMN ABOVE PLINTH BEAM Preview 02:38

In this lecture, you will learn how to calculate the shuttering area of columns. The height of the column is taken above the plinth beam. Because the shuttering work is calculated in two parts- below plinth beam and above plinth beam. The shuttering area is calculated so as to make the bill of sub-contractor also for the client bill. The bill is explained in MS-Excel and it is prepared according to AutoCAD drawing.

SHUTTERING AREA OF ROOF BEAM Preview 05:20

In this lecture, you will learn how to calculate the shuttering area of the roof beam. The shuttering plates are used on two faces of the beam's inner and outer face and also on the bottom surface. The shuttering area is calculated so as to make the bill of the sub-contractor and also for the client bill. The bill is explained in MS-Excel and it is prepared according to AutoCAD drawing.

SHUTTERING AREA OF SLAB Preview 02:23

In this lecture, you will learn how to calculate the shuttering area of the roof slab. The shuttering area is calculated so as to make the bill of the sub-contractor and also the bill is prepared for the client. The calculation of the shuttering area of the slab is explained in MS-Excel and it is prepared according to AutoCAD drawing.

CALCULATION OF CEMENT, SAND, AND AGGREGATE IN CONCRETE Preview 05:19

In this video, you will learn how to calculate the quantity of cement, sand, and aggregate in concrete. usually, the concrete on-site comes from the RMC plant but sometimes we have to make the concrete on-site by knowing the proper quantity of cement sand aggregate in the concrete according to the ratio.

HOW TO CALCULATE QUANTITY OF INTERNAL PLASTER OF WALL Preview 03:17

In this video, you will learn how to calculate the quantity of inner plaster of the building. we have to make a proper bill for the client as well as for the contractor. the minimum thickness used in the internal plaster is 10mm. the quantity of plaster is calculated according to drawing and the sheet is prepared in MS- Excel.

HOW TO CALCULATE QUANTITY OF EXTERNAL PLASTER OF WALL Preview 02:58

In this video, you will learn how to calculate the quantity of external plaster of the building. we have to make a proper bill for the client as well as for the contractor. the minimum thickness used in the external plaster is 10mm. the quantity of plaster is calculated according to drawing and the sheet is prepared in MS- Excel.

QUANTITY CALCULATION OF MARBLE WORK Preview 01:57

In this video, you will learn about marble work that is how to find the quantity of marble while doing marble work of building. the marble work is measured in square meters and square feet. quantity of marble work is explained in detail with AutoCAD and in MS-Excel.

QUANTITY CALCULATION OF TILE WORK Preview 01:40

Tiles are also used nowadays for flooring work so in this video you will learn about tile work that is how to find the number of tiles while doing tile work of building. the tiles are in numbers. The quantity of tile work is explained in detail with AutoCAD and MS-Excel.

INTRODUCTION TO BAR BENDING SCHEDULE Preview 04:41

In this lecture, you will learn about the bar bending schedule i.e, what is the bar bending schedule, and what is its use on the construction site.

PROCEDURE OF BAR BENDING SCHEDULE Preview 05:27

In this lecture, you will learn in detail how the bar bending schedule is prepared on-site. we have to measure the weight of steel for billing work.